Blue Star Power Systems · Diesel Product Line (Perkins)

New

Blue Star PD125-01

125 kW standby · Diesel · Liquid-cooled

125 kW Tier 3 diesel standby generator built by Blue Star Power Systems. Perkins 1106D-E70TAG2 six-cylinder engine with charge air cooling, Stamford UCI274E alternator, DSE DCP7310 controller.

Standby power
125 kW
Voltage options
120/240V, 120/208V, 277/480V, 347/600V
Frequency / Phase
60 Hz · 1/3-phase
Engine
Perkins 1106D-E70TAG2 · 7.01L
EPA / Emissions
Tier 3
Alternator
Stamford UCI274E
light-commercialcommerciallight-industrialmulti-familyworshipmunicipaltelecompump-station

Overview#

The Blue Star PD125-01 is a 125-kilowatt Tier 3 diesel standby generator powered by the Perkins 1106D-E70TAG2, a 7.01-liter six-cylinder electronically injected turbocharged and charge-air-cooled engine. It represents the transition point in Blue Star's Perkins lineup from 4-cylinder to 6-cylinder architecture, with a 110×54 in footprint that it shares with the PD150-01, PD180-01, and PD200-01.

Blue Star Power Systems (North Mankato, Minnesota) pairs the 1106D-E70TAG2 with a Stamford UCI274E alternator and DSE DCP7310 controller. At 3,700 lbs, the PD125-01 is substantially heavier than the 4-cylinder PD100-01 (2,500 lbs), reflecting the larger 6-cylinder engine and alternator package. The move to six cylinders also produces notably cooler exhaust (842°F) compared to the 4-cylinder models — a simpler exhaust system requirement.

The 1106D-E70TAG2 at 125 kWe#

The Perkins 1106D-E70 is one of the most widely deployed 6-cylinder generator engines in the world. At 7.01 liters, each cylinder is working comfortably at 125 kWe standby — there is significant headroom, since the same engine produces 150 kWe in the PD150-01. This lower specific output contributes to longer engine life and lower combustion temperatures. The 842°F exhaust temperature is among the lowest in the 100–200 kWe class across all manufacturers.

When to spec the PD125-01#

Our service experience#

The 1106D-E70TAG2 at 125 kWe is running comfortably below its peak. Load bank testing at commissioning is standard; at annual service, the lower combustion stress means cylinder and head components tend to have excellent longevity. Follow the Perkins 1100D generator series service schedule. Parts are globally available through the Perkins dealer network.

Engineering specifications

Physical

Length
110 in
Width
54 in
Height
65 in
Dry weight
3,700 lb

Acoustic

Sound @ 7m, full load
85 dBA
Enclosure
Open

Fuel system & runtime

Fuel use @ full load
9.58 GPH
Fuel use @ 75% load
7.87 GPH
Fuel use @ 50% load
5.62 GPH

Thermal & ventilation

Heat to coolant
256,800 BTU/hr
Heat radiated
154,320 BTU/hr
Exhaust flow
1,057 CFM
Exhaust temp
842 °F
Combustion air
509 CFM
Ventilation air
7,173 CFM

Documents & downloads

Spec sheets & manuals

Request a quote

Get pricing & lead time on the Blue Star PD125-01

Tell us about the application — kW, voltage, application, install timeline — and we'll respond within one business day with budgetary pricing, lead time, and any sizing notes.

Estimate runtime for the Blue Star PD125-01

Adjust load percent and tank size to estimate runtime. Pre-filled with this model's spec where available.

Estimate runtime on this tank

Estimated runtime

27.1 hours(1.1 days)

Fuel consumption ≈ 7.39 GPH at 75% load. Estimate based on industry-typical 1800 RPM standby curves (≈0.07 GPH/kW at full load). Actual consumption varies by engine, ambient temperature, fuel quality, and tuning.

Service intervals

Manufacturer-recommended intervals for the Blue Star PD125-01 under standby duty. Field intervals may differ based on load profile, ambient conditions, and fuel quality.

Oil & filter
Every 500 hours or 12 months
Coolant change
Every 6000 hours
Air filter
Every 1000 hours
Fuel filter
Every 500 hours
Major overhaul
20,000 hours
Load bank test
Every 12 months

Common failure modes

What we've seen fail on this platform. Use as a service-planning reference, not a diagnostic — actual failure modes depend heavily on duty cycle and maintenance history.

ComponentSymptomTypical hoursSeverity
Fuel quality / degradationHard starting, filter clogging, reduced power4,380+moderate
TurbochargerPower loss, excessive smoke under load12,000+moderate
BatteryFailed to start, slow crank8,760+minor

Frequently Asked Questions

What engine does the PD125-01 use?
The Perkins 1106D-E70TAG2 — a 7.01-liter, six-cylinder electronically injected turbocharged and charge-air-cooled diesel rated for this 125 kWe standby application. The 1106D platform marks a step up from the 4-cylinder 1104D series used in PD50–PD100, adding two cylinders and 2.61 liters of displacement for a smoother power delivery and lower combustion stress per cylinder. The same engine powers the PD150-01 at a higher output. It is EPA Tier 3 certified for stationary emergency use. Rated power is available up to 3,281 ft (1,000 m) at ambient temperatures to 104°F (40°C).
What controller does the PD125-01 use?
The DSE DCP7310 Digital Control Panel, with CAN Bus J1939 engine communication, digital metering, RS-485 interface, 8 programmable contact inputs, 10 contact outputs, and NFPA 110 Level 1 compatibility. It is cULus Listed and CE Approved with IP 65 ingress protection (with supplied gasket).
How does the PD125-01 compare to the PD100-01 and PD150-01?
The PD100-01 uses the 4-cylinder 1104D-E44TAG2 at 100 kWe on a smaller 90×44 in footprint (2,500 lbs). The PD125-01 moves to the 6-cylinder 1106D-E70TAG2 on a 110×54 in platform (3,700 lbs, 9.58 gph). The PD150-01 uses the same 1106D-E70TAG2 engine at a higher output (150 kWe) on the same 110×54 in footprint (3,775 lbs, 11.2 gph). The PD125-01 and PD150-01 share the same equipment pad, allowing an upgrade without structural changes.
What are the ventilation requirements for an indoor PD125-01 installation?
The PD125-01 requires 7,173 CFM of radiator cooling airflow and 509 CFM combustion air. Heat radiated to ambient is 154,320 BTU/hr; the coolant circuit rejects 256,800 BTU/hr. Exhaust exits at 842°F at 1,057 CFM — notably cooler exhaust than the 4-cylinder PD80/100 despite higher output, reflecting the 6-cylinder platform's efficiency. For fuel planning: at full load (9.58 gph), a 500-gallon tank provides approximately 52 hours of runtime.

Compatible equipment

Similar models

Blue Star Power Systems

New

Blue Star PD100-01

100 kW standby · Diesel · Liquid-cooled

100 kW Tier 3 diesel standby generator built by Blue Star Power Systems. Perkins 1104D-E44TAG2 turbocharged intercooled engine, Stamford UCI274C alternator, DSE DCP7310 controller.

Tier 33-phaselight-commercialcommercial

Blue Star Power Systems

New

Blue Star PD150-01

150 kW standby · Diesel · Liquid-cooled

150 kW Tier 3 diesel standby generator built by Blue Star Power Systems. Perkins 1106D-E70TAG2 six-cylinder engine with charge air cooling, Stamford UCI274F alternator, DSE DCP7310 controller.

Tier 33-phaselight-commercialcommercial

Blue Star Power Systems

New

Blue Star JD150-01

150 kW standby · Diesel · Liquid-cooled

150 kW Tier 3 diesel standby generator built by Blue Star Power Systems. John Deere 6068HF285 6-cylinder engine, Stamford UCI274/UCDI274 alternator, DSE DCP7310 controller.

Tier 33-phaselight-commercialcommercial

Blue Star Power Systems

New

Blue Star VD125-02FT4

125 kW standby · Diesel · Liquid-cooled

125 kW Tier 4 Final diesel standby generator from Blue Star Power Systems. Volvo Penta TAD572VE engine with charge-air cooling, paired with Basler DGC-2020 controller.

Tier 4 Final3-phasecommerciallight-industrial

Blue Star Power Systems

New

Blue Star VD125-04FT4

125 kW standby · Diesel · Liquid-cooled

125 kW Tier 4 Final diesel standby/prime generator from Blue Star Power Systems. Volvo Penta TAD582VE 5.13L inline-four with SCR/DPF/DOC, DSE DCP7310 controller, 208-600V.

Tier 4 Final3-phasecommercialsmall-commercial

Blue Star Power Systems

New

Blue Star VD125-04FT4MP

125 kW standby · Diesel · Liquid-cooled

125 kW Tier 4 Final / EU Stage 5 mobile trailer diesel generator built by Blue Star Power Systems. Volvo Penta TAD582VE four-cylinder engine, Stamford UCI274E alternator, DSE DCP7310 controller, 250-gallon integrated fuel tank.

Tier 4 Final3-phaseconstructiontemporary-power

Need service or parts for the Blue Star PD125-01?

We service every major OEM and stock genuine parts for the most common models.